Polyeco? PV waterproofing membrane

Scope of application

Scope of application: widely used in industrial and civil building roof waterproofing engineering, recommended products for photovoltaic energy single-layer roof waterproofing system.

Product specifications

Model

Thickness(mm)

Wide(m)

Length(m)

Lap edges

Execution standards

H-type (average material)

1.5、1.8

2.0

20

weld

GB27789-2011

Type P (fabric reinforced)

1.5、1.8、2.0

 

Product specification

1.Selected brand polymer raw materials, and improvedweather-proof formulas;


2.Excellent physical properties, and resistance totensile & tear and wind uplift;

3.Resistant to chemicals;


4.Extremely high light reflectivity (design value > 87%);UV resistance; effects in reducing room temperature and power consumption; mitigate urban heat islandeffect;

5.The measured time to failure caused by artificial weather aging is longer than 12,000 H; 6.FM certification: Tested to the most stringent US/international standards.

Technical indicators

Executive standard: GB27789-2011 "Thermoplastic polyolefin (TPO) waterproofing membrane"
Serial number project index
H P
1 The thickness of the resin layer on the intermediate tire base/mm≥ - 0.40
2 Tensile properties Maximum pull/(N/cm) ≥ - 250
Tensile strength/MPa ≥ 12.0 -
Elongation at maximum pull/% ≥ - 15
Elongation at break/% ≥ 500 -
3 Low temperature bending -40°C without cracks
4 Seam peel strength/(N/mm) ≥ 4.0 or coil destruction 3.0
5 Right angle tear strength/(N/mm) ≥ 60 -
6 Artificial climate accelerates aging Time/h More than 5000
Appearance No blistering, cracks, delamination, bonding and holes
Maximum pull retention/%≥ - 90
Tensile strength retention/%≥ 90 -
Elongation retention at maximum pull/%≥ - 90
Elongation at break retention/%≥ 90 -
Low temperature bending -40°C without cracks

Construction steps

Mechanical fixing method: Clean up the substrate layer >> Pave the vapor barrier >> Pave the insulation board >> Pave the waterproof coiled materials >> Fix the waterproof coiled material >> Do overlapping >> Strengthen the nodes >> Do a self-inspection and organize acceptance